Ingerclima — automatic slatted pool covers
+34 91 631 59 40 Get a Quote
Automatic cover with white slats over the pool of a villa with sea views on the Costa Blanca
Moraira and Teulada · Marina Alta, Costa Blanca

Automatic pool covers in Moraira (Teulada)

We manufacture and install automatic slatted covers across the whole municipality of Teulada-Moraira: the centre of Moraira and the harbour, El Portet and the Cap d'Or, the hillsides of Benimeit, Tabaira and La Sabatera, the districts of Moravit, La Cometa and Pinar de l'Advocat, and the inland town of Teulada. Made in our own factory, fitted by our own crew, with a three-year warranty on structure, motor, slats and installation.

The municipality is called Teulada, the pool is in Moraira, and there are 4,887 of them

Let us start with what confuses everybody, search engines included: the municipality is called Teulada, the town hall signs itself Teulada-Moraira and Moraira is its coastal centre. Yet hardly anyone searches for ‘Teulada’: people who own a house here say they live in Moraira, which is why this page is called what it is called. They are two towns in a single municipality of 32.24 km²: Teulada, the old town, inland at 185 metres above sea level, with its fortress church of Santa Catalina and a past built on muscatel grapes and raisins; and Moraira, on the coast, six kilometres further down the CV-743 road, with eight kilometres of shoreline, the yacht club, the Castell de Moraira above l'Ampolla beach and the Cap d'Or closing off El Portet. Between the two centres lie the outlying districts and urbanisations where most of the work is: Benimeit, Tabaira, La Sabatera, Moravit, La Cometa, Pinar de l'Advocat, San Jaime, Fanadix, Paichi and Pla del Mar.

And there are a great many pools. The Catastro has 4,887 pools on record in the municipality of Teulada, a figure out of all proportion for so small an area: more than 150 pools per square kilometre, and more registered pools than the city of Alicante (4,866) or Calpe (4,744). The explanation is town planning: there are no towers and no blocks on the seafront in Moraira, because for decades the local plan has backed low density and detached houses spread across the pine-covered hillsides. Where another stretch of coast would have a hundred-flat building, here there are twenty plots with a villa, a garden and a private pool. Then there is the owner profile: more than half the people on the municipal register are foreign — 54.5 % — and German, Dutch, British and Belgian buyers predominate.

What we install here is exactly what we make, and it is worth saying before anything else: every cover we make is motorised, running on 230 V, and there is no manual or hand-cranked version. As standard it is operated beside the pool with a key switch, hold-to-run — the slats move only while the switch is held and with the water in full view, which is the only safe way to work it; a remote control and operation from a phone appear in the quote as optional extras. The structure, the shaft, the supports and every bolt are always AISI 316L stainless steel, the molybdenum grade made for marine environments, never aluminium. The slats float on the water: there are no rails, no guides and no side profiles to clean or grease. What rests on the coping stone are the legs and, where one is specified, the housing — a housing we supply ourselves and which can be clad in the same material as the pool. And it carries no alarm and no obstacle sensors: running it with something on top, or pulling the slats by hand, gives no warning of any kind, it damages the mechanism.

We work the same way on a pool that has been in the ground for years in Benimeit as on a shell still under construction at El Portet. On an existing pool we fit the shaft above the water, resting on the coping stone, on view or inside a housing, without breaking into the shell or changing the filtration plant. On a new build there is room for a submerged shaft in its pit, which cannot be seen from the terrace but has to be allowed for before any concrete is poured. Everything is made to measure and takes 4 to 6 weeks, plus the installation. The warranty is three years and covers the whole cover: structure, motor, slats and installation. Our covers are built to the French standard NF P90-308. And one more thing, for the sake of honesty: the cover is made at our factory in Torrijos (Toledo) and fitted by our own crew, who travel to the Marina Alta; there is also the Andalusian branch, in San Pedro de Alcántara (Marbella). We have no office and no team in Alicante, in the Marina Alta or in Moraira, and we would rather you knew that before you called.

20+
years in the trade
5,000+
covers installed
100%
made in our own Spanish workshop
NF
P90-308 safety standard

What changes in a Moraira pool

Pine hillsides, retaining walls and a tight coping

Here the land climbs away from the sea in pine-covered hills and the plot is won with retaining walls. In Benimeit, in Tabaira, in La Sabatera or on the way up to El Portet the shell sits on a retaining wall, with the coping stone a hand's breadth from the edge and no slack at the sides. That shapes the whole project: a shaft above the water has to fit the width that is there, not the width we would like. Which is why we measure ourselves, at the pool itself, before anything is cut.

Marine air: 316L and no aluminium

The Cap d'Or, El Portet, Cala Cap Blanc and Cala l'Andragó leave salt-laden air over these pools for most of the year, and ordinary ironwork does not forgive it. Our whole structure, the shaft, the supports and all the fittings are AISI 316L stainless steel, the molybdenum grade used in marine environments; we do not change material by area and there is no cut-price version. All we ask of the owner is a rinse with fresh water now and again.

Houses that stand empty for months

More than half the people on the Teulada-Moraira register are foreign — 54.5 % — and a good share of the housing is second homes belonging to German, Dutch, British and Belgian owners, with houses that stand empty for long stretches. With the cover closed, pine needles and dust stay on top of the slats and come off with a hose: the bottom of the pool stays clean, the filtration plant works less and chemical use drops by around 35 %.

Where we install in Moraira and Teulada

We cover the whole municipality, from the centre of Moraira and its harbour to the hillside urbanisations, El Portet and the Cap d'Or, and the inland town of Teulada. And we carry on into the neighbouring municipalities of the Marina Alta, towards Benissa and Calpe as much as towards Benitatxell, Jávea and Dénia.

Moraira, harbour and beaches

  • Moraira town centre
  • L'Ampolla beach
  • Les Platgetes
  • Club Náutico Moraira

El Portet and Cap d'Or

  • El Portet
  • Pla del Mar
  • Cala l'Andragó
  • Cala Cap Blanc

Hillsides and outlying districts

  • Benimeit and Tabaira
  • La Sabatera
  • Moravit and La Cometa
  • Pinar de l'Advocat
  • San Jaime, Fanadix and Paichi

Teulada and neighbouring towns

An honest word about access, which here matters as much as the pool does: the slats and the shaft are made to measure and travel in long pieces, and a lorry simply does not fit down many of the streets in Moraira's urbanisations. The ramps that drop to El Portet, the narrow lanes of Benimeit and Pinar de l'Advocat and the streets of old Teulada all mean the approach has to be looked at before the quote. Before anything is agreed we check where the material is unloaded and how it is carried up to the pool. If the only way in is by hand, we say so and plan for it; we do not discover it on fitting day. If your pool is in a district you cannot see on the list, ask for a quote and we will confirm it.

Teulada-Moraira has 4,887 pools on the Catastro register

According to the Catastro there are 4,887 open-air pools on record in the municipality of Teulada, 162 more than in 2022, growth of 3.4 % in four years. The province of Alicante as a whole has 132,495 pools spread across 141 municipalities and has gained 6,360 since 2022, 5.0 % more, which makes it the second province in Spain by registered pools. The provincial average works out at some 940 pools per municipality: Teulada has more than five times that, in an area of only 32.24 km².

The figure is worth comparing before it is used. The provincial ranking is headed by Jávea / Xàbia — Teulada's neighbour — which with 9,317 pools has more than any other municipality in Alicante; behind it come Orihuela (7,375), Dénia (5,175) and Torrevieja (4,931). And practically level with Torrevieja comes Teulada, with 4,887: more than the city of Alicante (4,866) and more than Calpe (4,744). Look outside the province and Teulada-Moraira has more pools on record than Estepona (4,430) or Benalmádena (4,057), two Costa del Sol municipalities with far larger populations and far better known for their residential tourism.

That so small a municipality should hold so many pools is no accident, and the explanation is a planning one. Moraira grew from the nineteen-seventies without towers and without high-rise blocks on the seafront, under a plan that has protected low density, green space and the detached house spread across the pine-covered hills. The result, fifty years on, is a municipality of villas and houses on their own plots where a private pool is not the exception but the rule: at El Portet, at Pla del Mar, in Benimeit, in Tabaira, in La Sabatera, in Moravit or in La Cometa the plot ends up with a pool. On top of that the stock is a mature one, pools built decades ago to dimensions that rarely match a catalogue, which is exactly the job we are asked for most: covering a pool that already exists.

A necessary warning about these numbers, so that nobody reads more into them than is there. The Catastro register under-records: it is a floor, not a ceiling. Some pools were never declared, others are entered late and small ones never make it onto the register at all, so the real figure is higher than the published one. The Catastro does not separate the private pool from the communal one, from a hotel's or from a club's either: the 4,887 in Teulada are all the registered bodies of water in the municipality, not 4,887 houses with a pool. And the figure does not go below municipality level: there is no official breakdown by centre or by urbanisation, so it cannot be said how many are in Moraira and how many in the old town of Teulada, nor how many at El Portet or in Benimeit. When we divide the area up by district we do it by geography and by our own work, never by attributing figures to a neighbourhood.

In practice, that profile of a family pool on its own plot is the one that gets most out of a cover, and the argument here is not an aesthetic one. A closed slatted cover cuts evaporation by between 70 % and 80 %: in an 8 × 4 metre pool that is between 15,000 and 25,000 litres a year you do not have to replace, and in an area where it does not rain for most of the year and water is paid for, that is no small detail. If there is a heat pump, the system's consumption falls by between 50 % and 60 %, and with solar polycarbonate slats the water gains 6 or 7 °C during the day at no running cost. The other reason people call us is safety: closed, the slats form a continuous surface that keeps anyone out of the water and holds 100 kg as required by NF P90-308, which is a French standard, not a European one. It is worth saying plainly: that does not make it walkable or trafficable, and nobody should get on top of it. You can see the whole province on our page for pool covers in Alicante.

Salt, autumn cloudbursts and three hundred days of sun: what Moraira asks of a cover

Moraira's climate is its best selling point and, at the same time, what asks most of a cover. It is a very steady Mediterranean one, with around 300 days of sun a year, mild winters and a sea that acts as a thermostat: the Mediterranean gets close to 25 °C at the height of summer and is slow to cool down in autumn. That is not brochure copy: it is the same reason that inland, on the terraces of Teulada, muscatel grapes were grown for generations for raisins and for mistela.

For a pool that means the swimming season is genuinely long and that a cover earns its keep over more months of the year than almost anywhere else in Spain. But it also means a great many hours of radiation on the slats. A badly chosen slat fades and turns brittle within a few summers, above all on the south-facing terraces of El Portet, Pla del Mar or the hillsides of Benimeit. We work with profiles stabilised against ultraviolet light and we study the real orientation of each pool before recommending a finish and a colour.

The second thing is salt. Moraira has eight kilometres of shoreline and the housing looks out over it from everywhere: the Cap d'Or and its watchtower close off El Portet, and between the beaches open rocky coves such as Cala l'Andragó and Cala Cap Blanc. That salt breeze is the reason the whole structure, the shaft, the supports and every bolt are AISI 316L stainless steel and not some other material, and the reason we never use aluminium. The upkeep, on the other hand, is next to nothing: rinse the slats, the shaft and the supports with fresh water, above all after several days of sea wind. There are no rails or guides to clean or grease, because the slats float on the water.

The third thing is autumn. In the Marina Alta it rains little and badly: the sky is clear for most of the year, and then September and October deliver the rainfall all at once in gota fría episodes that can drop in a few hours what has not fallen in months. That water washes soil, grit and everything else off the hillside and into the pool. For the rest of the year it is the pine woods that do the dirtying: needles and cones end up in the water every time the wind blows off the land. With the cover closed that dirt stays on top and comes off with a hose, the bottom of the pool stays clean and the filtration plant works less. It counts for a great deal in a municipality where many owners leave the house shut up for half the season.

And safety counts, which is the other real reason people call us: closed, the cover is a sheet of rigid slats floating on the water and covering the whole pool — a physical barrier against a fall, not simply a saving on cleaning. With one warning we always repeat, mind: the cover carries no alarm and no obstacle sensors. It detects nothing and it does not stop by itself. Whoever operates it has to watch the water, and pulling the slats by hand or moving them with something on top damages the mechanism without warning.

With all that, choosing a slat in Moraira is not a matter of taste. PVC works well in the more sheltered pools of the town centre and the inland districts; solar polycarbonate puts those clear days to work, gaining temperature and stretching the season at the hillside villas; the clear slat looks best in pools with a sea view, of which there are many here. We explain all of it, with sections and weights, on our slat types page, and the shaft systems on cover models. What we do not do, so there is no misunderstanding, is walk-on covers, telescopic covers, pool enclosures, domes, winter tarpaulins or thermal blankets: only automatic slatted covers, and since 2005.

Installations along the coast

See more in the gallery →

How many months can you swim in Moraira?

With an automatic cover closed overnight, the swimming season in Moraira runs from May to November. Without one the pool is down to little more than the summer: the sun is never in short supply here, but the water in an uncovered pool loses at night what it gained during the day, exactly as it does anywhere else.

The cover does two things at once: it stops evaporation, which is where most of the heat goes, and if you choose solar polycarbonate slats it lets the sun through and warms the water underneath at no running cost. And to hold the same temperature right through the season, a heat pump with a cover in place uses 50-60 % less energy.

What owners say once the cover is in

4.7 15 Google reviews See them on Google →
SR

Santiago R.

June 2026

As my wife rightly says, how lucky we were to find this company! They have done a flawless job because they genuinely know their trade. They know covers, which is what they make and sell, and on top of that they are good people. Thoroughly recommended.

Google review
JC

Julia C.

August 2026

The cover is made from excellent materials and the finish is flawless. From the very first moment the service was outstanding and highly professional. They delivered everything they had promised and the result exceeded my expectations. Without a doubt, I recommend them 100 %.

Google review
T

Teresa

2025

From the first contact with the office through to the fitters on the last day, everything was perfect: thoroughly professional, punctual and tidy in their work. It is a pleasure to find companies like this.

Google review
GR

Giuliana R.

August 2026

An excellent pool cover! Everything was good, from the advice to the installation. The cover is very well made, works beautifully and keeps the pool clean and protected. We are delighted with it and would certainly recommend them.

Google Local Guide
EV

Eva V.

July 2026

Thoroughly recommended. We are delighted with the cover they have fitted for us. The service has been excellent from the very first moment, advising us at every step of the process.

Google review

What owners in Moraira and Teulada ask us

Our pool in Benimeit was built years ago. Can it be covered without building work?

Yes, and it is the job we are asked for most in Moraira. On an existing pool we fit the shaft above the water, resting on the coping stone on its AISI 316L stainless steel supports, on view or inside a housing. The shell is not broken into, the tiling is not touched and the filtration plant is not changed; we use the 230 V supply the pool already has. It is the usual solution on the hillsides of Benimeit, Tabaira and La Sabatera, where the shell was built decades ago and rarely has a catalogue dimension. We measure at your house and build to measure: 4 to 6 weeks from the moment the measurements are agreed, plus the installation.

Will it stand up to the salt air at El Portet and the Cap d'Or?

That is exactly what AISI 316L is for, a molybdenum-bearing stainless steel made precisely for marine environments. It is the material of our whole structure, of the shaft, of the supports and of every bolt, with no exceptions and no cut-price version, and we never use aluminium. The slats are not affected by salt either. All we ask of the owner is to rinse the surface with fresh water now and again, above all after several days of sea wind. There are no rails or guides to grease, because the slats float on the water.

We only come to Moraira a few weeks a year and the house is shut up. How is it organised?

It is the commonest situation in the municipality, where more than half the people on the register are foreign. We can measure with the house closed if a trusted person, the urbanisation manager or whoever looks after the pool lets us in; we build in Torrijos in the meantime and set the installation for the days you are in Moraira. The cover is operated beside the pool with a key switch, hold-to-run, so whoever looks after the house can open and close it without difficulty, with one condition: you have to watch the water, because the cover carries no alarm and no obstacle sensors and does not stop by itself. And with the cover closed while you are away, the bottom of the pool stays clean and chemical use drops by around 35 %.

We are building at El Portet and want nothing visible on the coping stone. Is there an option?

Yes: the submerged shaft. The shaft is hidden in a pit inside the shell itself and from the terrace you see nothing but water, which is exactly what you want when the whole argument of the house is the view over the cove and the Cap d'Or. The condition is timing: it has to be allowed for in the design, with its dimensions and its electrical supply, before the shell is concreted. If the pool is already built, the solution becomes a visible shaft above the water, on view or inside a housing; we supply that housing ourselves and it can be clad in the same material as the pool. Call us while the pool is still a drawing and we will talk to your builder directly.

Do you have an office in Moraira or in the Marina Alta? And is there a hand-cranked cover, without a motor?

We have no office and no team in Moraira, in the Marina Alta or in the province of Alicante. The cover is made at our factory in Torrijos (Toledo) and fitted by our own crew, who travel to the Marina Alta; there is also the Andalusian branch, in San Pedro de Alcántara (Marbella). We would rather put it that way than invent a local team. And no, there is no hand-cranked version: every cover we make is motorised and we do not build a manual one. What the customer does choose is two things: the shaft (above the water, with or without a housing, or submerged) and the slat (PVC, solar polycarbonate or clear). Nor do we make winter tarpaulins, thermal blankets, walk-on covers, telescopic covers or pool enclosures. The warranty is three years and covers the whole cover: structure, motor, slats and installation.

Architects, contractors and developers in Moraira

If you are an architect, a main contractor or a developer building housing in Moraira or Teulada, what matters is deciding on the cover at design stage: a submerged shaft has to be allowed for in the shell before any concrete is poured, and if the cover arrives at the end of the build it is normally resolved with a visible shaft on the coping stone. On the hillside plots with retaining walls at Benimeit, Tabaira or El Portet it is also worth checking the clear width of the coping early, along with the approach for carrying up the shaft, which travels in one piece. We manufacture ourselves in Torrijos (Toledo), with the structure and all fittings in AISI 316L stainless steel, and we install with our own crew, travelling to the Marina Alta. We give you dimensions, electrical consumption and the detail of the supports for the drawing, and manufacturing is planned at 4 to 6 weeks plus the installation. If the client is yours, the relationship stays with you.

How we work with professionals Download the slat comparison (PDF) →

Moraira: a longer season without the running costs

In Moraira the sun is there for most of the year, but the water in an uncovered pool cools down at night just as it does anywhere else. Which is why anyone wanting to stretch the season ends up looking at a heat pump.

Before choosing equipment it is worth knowing this: evaporation is the biggest route by which a pool loses heat, and an automatic slatted cover reduces it by between 70 % and 80 %. The consumption of the heating system falls with it by between 50 % and 60 %. Without a cover, the heat pump works all night replacing what evaporates.

The combination that works best in the Marina Alta is a cover with solar polycarbonate slats — which add up to 6-7 °C during the day at no running cost, putting this coast's roughly 300 days of sun to work — with equipment sized afterwards, once the losses are under control. You can see it in detail on pool heating.

Shall we talk about your pool in Moraira?

Tell us where the pool is — in the centre of Moraira, at El Portet, on the hillsides of Benimeit or Tabaira, or up in Teulada — and we will put together a no-obligation quote in under 24 hours. Made in our own factory in Torrijos, fitted by our own crew, with after-sales service and original spare parts.

Chat with us on WhatsApp