Ingerclima — automatic slatted pool covers
+34 91 631 59 40 Get a Quote
Automatic slatted pool cover on a villa pool on the Costa Blanca
Dénia · Direct from our own factory · We speak English

Automatic pool covers in Dénia

We make and fit motorised slatted covers for pools across Dénia: Les Rotes, the Montgó slopes, La Pedrera, Les Marines and the La Sella golf resort on the Dénia–Pedreguer boundary. Our own fitters travel out from our factory in Torrijos, near Toledo — the same people who built your cover.

Built in our own factory in Toledo, fitted at your pool in Dénia

Dénia sits between the Montgó, 753 metres of pine-covered limestone, and twenty kilometres of coast from the rock pools of Les Rotes to the open sand at Les Deveses. It is a town of private pools: villas on the Montgó slopes, gated developments at La Sella, on the Dénia–Pedreguer boundary, single-storey villas along Les Marines. Almost a third of the town's residents come from abroad, and a great many of those pools stand unused for weeks at a time. That is the problem an automatic cover solves. Ours is a motorised slatted cover: a deck of PVC or polycarbonate slats that floats on the water and closes at the turn of a key, keeping out pine needles, dust and windblown sand, holding the day's warmth in the water overnight, and forming a physical barrier over the pool when nobody is there. Ingerclima has been manufacturing in Torrijos, Toledo, since 2005, with a branch in San Pedro de Alcántara, Marbella, and more than 5,000 covers installed. We build the covers and fit them ourselves. No subcontractors.

20+
years in the trade
5,000+
covers installed
100%
made in our own Spanish workshop
NF
P90-308 safety standard

Why choose Ingerclima in Dénia

A base on your stretch of coast

Our southern workshop and fitting team sit in San Pedro de Alcántara, Marbella — a short drive from any pool in Mijas. We survey, manufacture and install ourselves, so there are no intermediaries, no imported covers and no waiting on a third party to travel down.

Short, in-house timelines

Because we make our own slats, motors and control units, a Mijas project typically runs 4–6 weeks in the workshop and then just 1–2 days on site — whether your pool is in Calahonda, Riviera del Sol or up at La Cala Golf, the schedule is ours to keep, not a subcontractor's.

Local after-sales that stays local

With more than 20 years and over 5,000 installations behind us, the same team that fits your cover also services it. If a motor or a slat ever needs attention, help comes from our own technicians just along the Costa del Sol — not a distant call centre.

Where we install around Dénia

We work right across Dénia, from the old town and the port to the seafront strips and the hillside urbanisations, as well as the towns and villages around it in the Marina Alta. If your property is not on the list, just ask — the odds are we cover it.

The Dénia seafront

  • Les Rotes (Las Rotas)
  • Marineta Cassiana
  • Les Marines (Las Marinas)
  • Les Deveses

The Montgó and the hillsides

  • El Montgó
  • La Pedrera
  • La Marquesa I–VI
  • Els Campusos
  • Galeretes

The town and the inland villages

  • Dénia old town and castle
  • The port and marina
  • La Xara
  • Jesús Pobre

Nearby towns

  • Xàbia (Jávea)
  • La Sella (Dénia and Pedreguer)
  • Pedreguer
  • Els Poblets
  • El Verger
  • Ondara

In Dénia, access matters more than the postcode. On the Montgó and at Les Rotes, plots are cut into the slope in terraces, with narrow driveways and hairpin bends, and that decides how we get the slats down to the poolside. Along Les Marines the air is salt-laden and the levante wind is constant. Dénia is 03700, with 03709 for La Xara and 03749 for Jesús Pobre, and the particulars differ street by street: we survey access before quoting, and our structure and fixings are 316L stainless steel throughout.

Dénia's climate and the right slat for it

Dénia gets around 300 days of sun a year. The summers are long and dry, the winters mild, and the rain arrives in short bursts in spring and autumn. The swimming season runs from May to well into October: by then the sea has soaked up a whole summer of heat, and the water stays pleasant long after the sun has lost its edge.

The sun is also what empties your pool. Over a July on the Costa Blanca an uncovered pool can lose several centimetres of water a week to evaporation, and every litre you top up has to be balanced and treated again. A closed slatted cover cuts that loss sharply, holds some of the day's warmth in the water overnight and keeps the chemistry steady between visits, which matters most when nobody is there to check it.

Then there is what lands on the water. The Aleppo pines on the Montgó shed needles all year; the levante blows sand up off the shore at Les Marines; and a calima — the Saharan dust haze — can leave a fine red film on everything for days. On an uncovered pool that means a skimmer basket full of debris on every visit. Closed, the surface simply stays clean until you come back.

Safety is the other half of it. Our covers are built to NF P90-308, the French safety standard the industry uses across Europe: with the cover shut, the slats rest on the water as a physical barrier and the water is not directly accessible. It is a barrier, not a substitute for supervision. If the house is let out or stands empty between visits, that barrier is doing its job every day you are not in Dénia, whether or not anyone remembers to think about it.

Which slat, then? PVC is the tougher of the two and the one most owners here choose: it shrugs off pine needles, dust and salt air, needs little looking after and comes in several colours. Solar polycarbonate is translucent and traps the sun's heat, warming the water by a few degrees and adding weeks at each end of the season. Clear polycarbonate is the third option, for owners who want to keep the water visible. <a href="/en/lamas.html">Compare PVC and polycarbonate slats</a>.

Recent installations

See more in the gallery →

What owners say once the cover is in

4.7 15 Google reviews See them on Google →
SR

Santiago R.

“As my wife rightly says — how lucky we were to find this company. They have done a flawless job because they genuinely know their trade. They know covers, which is what they make and sell, and on top of that they are good people. Thoroughly recommended.”

Google review · translated from Spanish
JC

Julia C.

“The cover is made from excellent materials and the finish is flawless. From the very first contact the service was outstanding and highly professional. They delivered everything they promised and the result exceeded my expectations. I would recommend them without hesitation.”

Google review · translated from Spanish
T

Teresa

“From the first phone call with the office through to the fitters on the last day, everything was spot on: professional, punctual and tidy. It is a pleasure to find companies that still work like this.”

Google review · translated from Spanish
GR

Giuliana R.

“Excellent pool cover. Everything was good, from the advice to the installation. The cover is very well made, works beautifully and keeps the pool clean and protected. We are delighted with it and would certainly recommend them.”

Google Local Guide · translated from Spanish
EV

Eva V.

“Thoroughly recommended. We are delighted with the cover they fitted for us. The service has been excellent from the very first moment, advising us at every step of the process.”

Google review · translated from Spanish

What owners in Dénia ask us

You are based in Toledo and Marbella — do you actually cover Dénia?

Yes. We manufacture at Torrijos in Toledo, we have a branch in San Pedro de Alcántara, Marbella, and our own fitting teams work right across Spain, including Dénia and the Marina Alta. Lead time is roughly four to six weeks; the fitting itself normally takes a day or two on site. You deal with the manufacturer from the first survey to the last adjustment — call +34 91 631 59 40 or write to info@ingerclima.com and we will arrange the survey.

I only spend part of the year in Dénia. Can you work around that?

That is normal here and we plan for it. The survey can be done while you are in Spain, or from your own photographs and measurements if you are not, and we agree fitting dates with you rather than turning up unannounced. Servicing works the same way: tell us the weeks you will be in Dénia and we book the visit then. Plenty of our Marina Alta clients leave a key with a neighbour or a property manager.

Can we deal with you in English?

Yes. We quote, correspond and invoice in English, and you speak to the same person from the first survey through to handover. Overseas owners are a large part of what we do in the Marina Alta. Where a licence or a permission is involved we say so plainly, and we give your builder or architect the technical drawings they need.

Which roller should I choose for my pool?

There are two. An above-water roller sits on the coping stones at one end, on view, either open or inside a housing box. It goes onto an existing pool with no work on the shell, which is why most of the covers we fit in Dénia use one. A submerged roller sits out of sight inside the pool at one end and is designed in while the pool is being built. Both are motorised at 230 V; there is no manual version.

The house is let out while we are away. Is the cover safe to leave with guests?

The cover is operated with a key switch: take the key with you and the pool stays closed. That is the point of a slatted cover built to NF P90-308 — it is a barrier over the water, not just a lid. Guests or cleaners who need the pool open get the key from whoever manages the property, and we go through the operating instructions with you or your manager at handover.

Other areas we cover in Alicante

Architects, contractors and developers in Dénia

We manufacture in our own workshop in Torrijos (Toledo), with the structure and all fittings in 316L stainless steel, and we carry out the installation ourselves. For a practice, a main contractor or a developer, the decision that really matters is taken at design stage: a recess for the submerged shaft has to be allowed for in the pool shell before any concrete is poured, whereas an automatic slatted cover brought in at the end of the build is normally resolved with a visible shaft resting on the coping. If the project is in Dénia and the client is yours, the relationship stays with you.

How we work with professionals Download the slat comparison (PDF) →

Talk to the people who make and fit your cover

Tell us about your pool in Mijas and we'll recommend the right slat, then give you a clear price and timeline. Call +34 916 315 940, message us on WhatsApp at +34 675 651 156, or ask us to arrange a site visit from our San Pedro de Alcántara base.

Ready to cover your pool in Dénia?

Tell us the size of your pool and we will come back with a tailored quote, free and with no obligation, within 24 h (Mon-Fri, 8am-4pm CET).

Chat with us on WhatsApp