Three straight answers before you read any further
We are the manufacturer: every cover is built to your own shell's measurements in our factory in Torrijos (Toledo), where we have made slatted covers since 2005 — more than 5,000 of them. Our Andalusian office is at C. Jorge Guillén 6, in San Pedro de Alcántara itself, between the Guadalmina and the Guadaiza, and the survey, the fitting and whatever the cover needs in year four are done by that team. If your house is in Guadalmina Baja or Cortijo Blanco, the person who measured your pool is a few minutes from it.
Second, whether it pays for itself. Most owners here are looking at four to seven years. An 8 by 4 pool loses 15,000 to 25,000 litres a year to evaporation; the cover stops 70 to 80 per cent of that, cuts chemical consumption by around 35 per cent, and with a heat pump saves 50 to 60 per cent of the heating energy. The cost nobody budgets for is the other one: a pool topped up every day through a San Pedro summer, with the poniente blowing across it, is one whose chemistry you are permanently chasing, because every top-up dilutes what you have just corrected.
Third, what you are buying. Every cover is motorised; there is no hand-cranked version. The control is hold-to-run: the slats travel only while the button is held. You choose where the shaft goes — above the water on the coping, or submerged in a pit out of sight — and the slat: PVC, solar polycarbonate or transparent polycarbonate. They are built to NF P90-308, the French standard the sector works to. A closed cover is built to take the weight of an adult who falls on it, around 100 kg, but it is not a walkable surface and never replaces an adult watching the water. Manufacture takes four to five weeks, fitting one or two days.



