Ingerclima — automatic slatted pool covers
+34 91 631 59 40 Get a Quote
Automatic slatted pool cover rolling open on a private villa pool in Mijas Costa
Costa del Sol · Mijas

Automatic pool covers in Mijas

Spanish-made slatted covers — PVC or polycarbonate, always motorised — designed, fabricated and fitted by our own team, with a base just along the coast in San Pedro de Alcántara, Marbella. Three-year warranty covering structure, motor, slats and installation.

Automatic slatted covers, made in Spain and fitted across Mijas

Ingerclima designs, builds and installs motorised slatted pool covers — floating shutters of PVC or polycarbonate that roll back at the touch of a button and rest on the water's surface. We are the manufacturer and the installer, both roles under one roof, working throughout Mijas Pueblo, La Cala de Mijas, Las Lagunas and the coastal urbanisations from our own base in San Pedro de Alcántara, just up the coast in Marbella. Every cover we make is motorised; there is no manual version and no product shipped in from abroad — only covers we build ourselves and fit with our own crew.

20+
years in the trade
5,000+
covers installed
100%
made in our own Spanish workshop
NF
P90-308 safety standard

Why choose Ingerclima

A base on your stretch of coast

Our southern workshop and fitting team sit in San Pedro de Alcántara, Marbella — a short drive from any pool in Mijas. We survey, manufacture and install ourselves, so there are no intermediaries, no imported covers and no waiting on a third party to travel down.

Short, in-house timelines

Because we make our own slats, motors and control units, a Mijas project typically runs 4–5 weeks in the workshop and then just 1–2 days on site — whether your pool is in Calahonda, Riviera del Sol or up at La Cala Golf, the schedule is ours to keep, not a subcontractor's.

Local after-sales that stays local

With more than 20 years and over 5,000 installations behind us, the same team that fits your cover also services it. If a motor or a slat ever needs attention, help comes from our own technicians just along the Costa del Sol — not a distant call centre.

The two questions we are asked first in Mijas

The first question is where we actually are, and the honest answer is two places. Every cover is built to your shell's measurements in our own factory in Torrijos, Toledo. We have been making slatted covers since 2005 — more than 5,000 of them. The survey, the measuring, the fitting and whatever the cover needs in year three are our own team on this coast, based at C. Jorge Guillén 6 in San Pedro de Alcántara, Marbella, a little over half an hour from Mijas Costa. No agents, no subcontracted crews. We are rated 4.7 out of 5 across 15 Google reviews.

The second is whether a pool tiled fifteen years ago has to be opened up again. Almost never. On a finished pool the shaft rests above the water on AISI 316L stainless steel supports on the coping, with a box over it or without one, and nothing is cut into the shell. A submerged shaft sits in a pit under the water and stays out of sight, but it has to be allowed for before the concrete is poured, so it belongs to a new build or a full refurbishment. Manufacture takes four to five weeks from your approval; fitting is one or two days.

What it is worth tends to be asked last and matters most. An 8 by 4 metre pool loses 15,000 to 25,000 litres a year to evaporation, and a cover cuts that by 70 to 80 per cent. Less organic matter in the water means roughly 35 per cent less chemical consumption, and with a heat pump a closed cover takes 50 to 60 per cent off the heating energy. Counting the water, the chemicals and the maintenance visits you stop needing, a cover on this coast pays for itself in four to seven years, and it is kept far longer than that: the structure lasts beyond 15 years, the slats 10 to 15.

Where we install around Mijas

From the whitewashed lanes of Mijas Pueblo down to the seafront at La Cala, we fit covers across the whole municipality and its neighbouring towns. A selection of the areas we regularly work in:

Golf resorts and gated developments: we cover the whole municipality (postcodes 29649, 29650 and 29651) and install frequently in gated developments and golf resorts such as Calahonda, La Cala Golf and Mijas Golf, arranging vehicle access and delivery with security and the concierge beforehand so the fitting runs without a hitch.

The Mijas climate and which slat suits your pool

Mijas enjoys one of the mildest climates on the Costa del Sol — more than 2,800 hours of sunshine a year and an average annual temperature of around 19°C. Summers are hot and dry, while winters stay gentle, with daytime highs often near 17–20°C even in January. Those long, warm shoulder seasons make Mijas one of the best places in Spain to keep a pool in use well beyond July and August.

The catch is the water. Along the coast between Fuengirola and La Cala the sea only reaches a comfortable 23–25°C in August and September, and private pools follow a similar lag — glorious by day in high summer, but slow to warm in spring and quick to cool once the autumn rains arrive around November. An automatic cover holds the day's heat overnight and cuts evaporation from the coastal breeze, which is exactly where the choice of slat starts to matter.

For most villas in Riviera del Sol, Calahonda or La Cala Golf we recommend solar polycarbonate slats. They let the strong Mijas sun pass through to warm the water, typically adding several degrees over a season and stretching comfortable bathing into May and October. PVC slats are the robust, economical choice: excellent insulation that holds heat overnight and keeps out the pine needles, leaves and occasional Saharan dust that Mijas gardens know well. Transparent polycarbonate is the design option for homes where the pool takes centre stage against a sea or golf-course view.

Whatever the slat, every Ingerclima cover is motorised and floats on the surface, so it also insulates against the cooler mountain nights felt higher up near Mijas Pueblo and keeps the water clean through the wet, windy weeks of late autumn and winter. The result is a longer, safer and far lower-maintenance bathing season.

See all our options in Cover models and Slat types.

Recent installations

See more in the gallery →

The English-speaking owner here is often a resident, not a visitor

Mijas is not a fortnight-in-August town, and that changes the brief. It is the fastest-growing municipality in the province of Málaga, close to 95,000 residents and adding some 1,800 in a single year, split between the white village up in the sierra and twelve kilometres of coast between Fuengirola and Marbella. Sitio de Calahonda on its own is around 7,000 homes. Much of that coastal strip — Calahonda, Riviera del Sol, La Cala de Mijas, Miraflores, El Chaparral — was built for British, Scandinavian and German owners, and a good share of them live here all year rather than visiting.

So three different people read this page. The resident who swims from April to November, opens and closes the pool most days, and covers it overnight because the poniente and the terral take the afternoon's heat straight back out of the water. The owner who is here in spells and leaves the pool to itself for months at a time. And the owner who lets the house, needs the water clean between arrivals, and is asked about small children by every family that books. A cover answers all three, for three different reasons, and the slat that suits each is not the same one.

What all three share is the salt and the dirt, and that is a materials question before it is a slat question. The structure, the shafts, the brackets and every fastener are AISI 316L stainless steel, the marine grade, which is the difference between a cover a few hundred metres from the beach that still runs smoothly ten years in and one that does not. On the front line an easterly leaves a salt haze over everything, so we ask for a rinse with fresh water every few weeks: a hose, no products, five minutes, and that is close to the whole of the upkeep. Which slat suits the pool we settle on the survey, in front of the water and the garden, rather than on a page.

How many months can you swim in Mijas?

With an automatic cover closed overnight, the swimming season in Mijas runs from May to November. Without one the pool is down to the short summer: the water is slow to warm up in spring and loses it as soon as the sun eases off.

What the cover gains, it gains by cutting evaporation, the main route by which an open-air pool loses heat. With solar polycarbonate the sun also warms the water under the slats at no cost. To keep the temperature whatever the weather there is the heat pump, which with a cover uses 50-60 % less.

What owners say once the cover is in

4.7 15 Google reviews See them on Google →
SR

Santiago R.

“As my wife rightly says — how lucky we were to find this company. They have done a flawless job because they genuinely know their trade. They know covers, which is what they make and sell, and on top of that they are good people. Thoroughly recommended.”

Google review · translated from Spanish
JC

Julia C.

“The cover is made from excellent materials and the finish is flawless. From the very first contact the service was outstanding and highly professional. They delivered everything they promised and the result exceeded my expectations. I would recommend them without hesitation.”

Google review · translated from Spanish
T

Teresa

“From the first phone call with the office through to the fitters on the last day, everything was spot on: professional, punctual and tidy. It is a pleasure to find companies that still work like this.”

Google review · translated from Spanish
GR

Giuliana R.

“Excellent pool cover. Everything was good, from the advice to the installation. The cover is very well made, works beautifully and keeps the pool clean and protected. We are delighted with it and would certainly recommend them.”

Google Local Guide · translated from Spanish
EV

Eva V.

“Thoroughly recommended. We are delighted with the cover they fitted for us. The service has been excellent from the very first moment, advising us at every step of the process.”

Google review · translated from Spanish

Arranging a cover for a Mijas pool from abroad

Most of this is settled before anybody has to be at the poolside. You deal with us and nobody else: our phone, our form, our quotation. If you can send the internal length and width of the shell, photographs of both ends and of the coping, and one of the way in to the pool area at its tightest point, we can work from that. If you would rather not measure anything, the San Pedro de Alcántara team takes the measurements on site with whoever has access — a property manager, a caretaker, the pool maintenance company, a neighbour holding a key — and you do not need to be in the country for it.

The quotation comes back by email, itemised and with no obligation. We publish no prices for the covers, because each one is built to a single shell's dimensions and a guide figure would tell you nothing useful. From there, two decisions are yours and both can be taken from a screen: where the shaft sits — above the water on AISI 316L supports on the coping, which is the normal answer on a pool that already exists, or submerged in a pit under the water, which has to be allowed for before the shell is concreted — and which slat the cover carries: PVC, solar polycarbonate, which warms the water by 6 or 7 °C with nothing consumed, or transparent polycarbonate.

After that, manufacture takes four to five weeks in Torrijos and the fitting one or two days, on a date we agree with whoever is at the house. If you are not here for it, we send photographs of the finished job. Every cover is motorised, worked by a key switch or a remote, and the drive is hold-to-run: the slats move only while the button is held, so the cover cannot run on its own while the house is empty, and there is no hand-cranked version. Whoever looks after the house is shown how to open and close it on handover day, and that is the whole lesson.

Then the cover earns its keep in the months when nobody is here. The pool that ends up emptied and refilled, or topped up almost every day of a Mijas summer, is the uncovered one that got away from whoever was minding it. Closed, the cover holds the water in, keeps the salt haze, the sand and the leaves out, and stops the chemicals leaving with the evaporation, so the water you find on your next trip is water to treat rather than throw away. Whoever looks after the house can work it, and we show them how on handover day. We build to the French standard NF P90-308, the sector's reference: closed and anchored, the sheet of slats stops a child or a pet falling in, but it is not a walkable surface and it never replaces an adult watching the pool.

Frequently asked questions

How quickly can you install a pool cover in Mijas, and do you travel out to us?

Yes — we cover the whole of Mijas from our base in San Pedro de Alcántara, near Marbella, so there is no long-distance shipping involved. Manufacturing usually takes about 4–5 weeks; once your cover is ready, fitting on site normally takes just one to two days.

Which type of slat works best for the Mijas climate?

For most homes we suggest solar polycarbonate slats, which use the strong Costa del Sol sun to warm the water and extend the bathing season into spring and autumn. PVC is the tough, economical option with excellent insulation, and transparent polycarbonate is chosen where the pool is a design feature. We advise pool by pool during the survey rather than applying a one-size-fits-all answer.

What maintenance does an automatic cover need, and who handles any repairs?

Very little — an occasional rinse of the slats and a quick visual check of the mechanism. Every cover is motorised and built to last; should anything ever need attention, our own technicians service it directly, working from the same Marbella-area team that installed it.

The property is a holiday let. Is a cover worth it commercially?

For most owners in Mijas it pays for itself twice over. Closed, it keeps the pool clean between bookings, which cuts pool-maintenance visits and the chemical bill; and it meets the NF P90-308 safety standard, which is a genuine selling point with families booking with small children. It does not replace adult supervision, but it removes casual access to the water.

Can you fit a cover to an irregular or kidney-shaped pool?

Usually, yes. Because every cover is built to size in our own workshop rather than bought off a shelf, we can work with shapes that are not a plain rectangle, with Roman steps and with beach entries. What matters more in practice is the access to the pool area, so we measure that as well as the water when we visit.

Architects, contractors and developers in Mijas

We manufacture in our own workshop in Torrijos (Toledo), with the structure and all fittings in 316L stainless steel, and we carry out the installation ourselves. For a practice, a main contractor or a developer, the decision that really matters is taken at design stage: a recess for the submerged shaft has to be allowed for in the pool shell before any concrete is poured, whereas an automatic slatted cover brought in at the end of the build is normally resolved with a visible shaft resting on the coping. If the project is in Mijas and the client is yours, the relationship stays with you.

How we work with professionals Download the slat comparison (PDF) →

Talk to the people who make and fit your cover

Tell us about your pool in Mijas and we'll recommend the right slat, then give you a clear price and timeline. Call +34 916 315 940, message us on WhatsApp at +34 675 651 156, or ask us to arrange a site visit from our San Pedro de Alcántara base.

Chat with us on WhatsApp