Ingerclima — automatic slatted pool covers
+34 91 631 59 40 Get a Quote
Automatic slatted cover over the pool of a villa with its own plot on the Mediterranean coast
Mont-roig del Camp · Baix Camp, Costa Dorada

Automatic Pool Covers in Mont-roig del Camp

We build and install automatic slatted covers right across the municipality: Miami Platja and the Platja Cristall seafront, the coves to the north, the village, Les Pobles, Bonmont Terres Noves and the twenty-odd estates in the municipality. Built in our own factory in Torrijos, fitted by our Barcelona team, with the three-year Ingerclima warranty behind it.

Two villages, 12 km of coast and 2,614 pools in the same municipality

Mont-roig del Camp is, in practice, two towns inside one. On one side the historic village, inland, with the red sandstone hill of the Mare de Déu de la Roca hermitage above it, acting as a lookout over the Camp de Tarragona. On the other Miami Platja, the coastal village at sea level, with a postcode of its own — 43892 — and more than twice the population of the village: 8,342 residents against 3,771, plus 2,539 in Les Pobles. In between, what keeps us busy: over twenty estates spread across a municipality of 63.32 km², among them Mont-roig Badia and Bonmont Terres Noves, the villas that ring the golf course. All of it in the Baix Camp, along the 12 kilometres of coastline the municipality holds.

And there are plenty of pools. The Land Registry records 2,614 uncovered pools in the municipality, 86 more than in 2022, and that puts Mont-roig del Camp third of the 184 municipalities in the province of Tarragona, behind only El Vendrell and Calafell. The explanation is not hotel tourism but the house of your own: 66.8% of family dwellings are not a main residence — 11,136 of 16,661, according to the 2021 Census — two occasional-use homes for every one lived in all year round. On top of that, a population register of 14,652 people at 1 January 2025 with 4,163 residents of foreign nationality, 28.41%. A plot, a garden and a pool of your own, used for half the year.

What we install here is exactly what we build, and it is worth saying before anything else: all our covers are motorised, and there is no manual or crank version. As standard they are operated beside the pool with a key switch and hold-to-run, with the water in full view; a remote control and phone operation go on the quote as options. The frame, the shaft, the brackets and the fixings are always AISI 316L stainless steel, the molybdenum grade made for marine air, and never aluminium. The slats float on the water: there are no rails, no guides, no side profiles, and no slat rests on anything. What rests on the coping stone are the legs of the roller unit; the housing, where there is one, covers the shaft and is not a bench to sit on. And it has no alarm and no obstacle sensors: it detects nothing and it does not stop on its own, so you operate it watching the water, with nothing on top, and you never pull the slats by hand.

We work the same way on the pool that already exists in an estate in Miami Platja as on the shell still under construction at a villa in Bonmont. On a finished pool we fit the roller unit above the water, with its legs on the coping stone, left visible or with a housing. In new build there is room for the submerged shaft in its recess, which is out of sight from the terrace but has to be allowed for before the concrete is poured. Manufacture is made to measure and takes 4 to 5 weeks, plus the fitting, which is 1 or 2 days. The warranty is three years and covers structure, motor, slats and fitting, and the cover is built to the French NF P90-308 standard. And one more thing, so you know who will turn up at your house: we are the manufacturer and the cover is made to size at our plant in Torrijos (Toledo), but the people who measure and fit it are our Barcelona team, who cover the whole of Catalonia: Barcelona, Girona, Tarragona and Lleida. The visit, the measuring, the fitting and the after-sales are done by people from here, not by someone passing through, and the three-year warranty is Ingerclima’s.

20+
years of experience
5,000+
covers installed
100%
built in our own factory in Spain
NF
P90-308 safety standard

What changes on a pool in Mont-roig del Camp

Two levels and two very different pools

The municipality runs from sea level up to the inland hills, with the Serra de Llaberia and the Mola de Colldejou closing it off behind. A pool in Miami Platja and one on a plot at Bonmont or Les Pobles do not have the same problem: the first lives facing the sea, with salt and breeze all year round; the second is more sheltered but takes whatever comes down off the hills. The roller unit above the water has to fit the width of coping there is in each case, so our Barcelona team measures it at your house before we cut anything.

Marine air: 316L and no aluminium

Twelve kilometres of coast: low golden sand along the Miami Platja seafront, including the 1,200 metres of the Platja Cristall, and a rocky run of coves north of the village. That breeze leaves salt on the pool for much of the year, and ordinary fixings do not forgive it. Our frame, the shaft, the brackets and the fittings are AISI 316L stainless steel, the molybdenum grade made for marine air; we never use aluminium.

Houses that stand closed for months

Here occasional-use housing is not a slice of the stock: it is the majority. The 2021 Census counts 16,661 family dwellings, of which 11,136 are not a main residence — 66.8%. With the cover closed while the house is empty, leaves and dust stay on top of the slats and come off with a hose: the bottom stays clean and chemical use falls by around 35%.

Where we install in Mont-roig del Camp

We cover the whole municipality: Miami Platja, the run of coves, the village, Les Pobles and the estates across the municipality. And we carry on through the rest of the Baix Camp and the Costa Dorada.

Miami Platja and the beachfront

  • Miami Platja (43892)
  • Platja Cristall
  • Seafront promenade and Club de Mar
  • Platja de la Punta del Riu
  • Mouth of the riu de Llastres

The coves and the rocky coast

  • Cala dels Àngels
  • Cala del Pescador
  • Cala Bot
  • Cala Califòrnia
  • Cala dels Penyals
  • Cala de Rifà

Village, Les Pobles and the estates

  • Mont-roig del Camp (the village)
  • Les Pobles
  • Els Masos d’en Blader
  • Bonmont Terres Noves
  • Mont-roig Badia
  • Over twenty estates across the municipality
  • Around the Mare de Déu de la Roca

Comarca and neighbouring towns

An honest word about access, which here counts for as much as the pool: the shaft travels in one piece and the slats in long bundles, and a lorry cannot get down many of the streets on these estates. With roads laid out by old parcelling schemes and stretches on a slope heading up towards the hills, the first thing we check is where the material can be unloaded and how it gets up to the pool; if the only way in is by hand, we say so and we plan for it. If your pool is on an estate you cannot see in the list, ask for a quote and we will confirm it for you.

Mont-roig del Camp has 2,614 pools on the Land Registry

According to the Land Registry there are 2,614 uncovered pools registered in Mont-roig del Camp, 86 more than in 2022, when there were 2,528: a rise of 3.4% in four years. That figure makes the town third of the 184 municipalities in the province of Tarragona, behind El Vendrell (2,807) and Calafell (2,802), and ahead of L’Ametlla de Mar (2,342), Cambrils (1,837), Tortosa (1,718), Cunit (1,582), the city of Tarragona (1,533), Roda de Berà (1,321), El Catllar (1,270), Reus (1,125) and Salou (824). Fewer than 200 pools separate the top three: this is a province where the pools are spread right along its coastline.

The province of Tarragona adds up to 41,968 pools and has gained 1,825 since 2022, 4.5% in four years. Catalonia as a whole has 204,648 pools across 936 municipalities: Barcelona leads with 108,322, Girona is second with 46,007, Tarragona third and Lleida fourth with 8,351. For scale: Madrid is the first province in Spain with 147,555 pools, Alicante the second with 132,495, and Málaga records 83,789. Tarragona is not in that league by sheer volume, but Mont-roig del Camp stands out for concentration: 2,614 pools in 63.32 km² is around 41 per square kilometre, and its total is more than eleven times the provincial average of 228 pools per municipality (41,968 shared between 184). It also works out at around 18 pools for every 100 of its 14,652 registered residents.

A medium-sized municipality holding that many pools is no accident, and the explanation lies in the housing stock. The 2021 Population and Housing Census counts 16,661 family dwellings, of which only 5,525 are main residences and 11,136 are not: 66.8% of the stock is occasional-use housing, two non-main homes for every main one. That is the profile of a tourist-residential town of owner-occupied houses, reinforced by the number of campsites within the municipality and by a population register in which 28.41% are residents of foreign nationality. And where a pool is only used for half the year, a cover makes even more sense: it is working in the months when nobody is standing in front of it.

A necessary word of caution about these numbers, so that nobody reads more into them than they say. The Land Registry census under-records: it is a floor, not a ceiling, because some pools are never declared and others are entered late. It also makes no distinction between a private pool, a communal one and a campsite pool, and that matters here: the 2,614 are every body of water in the municipality, not 2,614 houses with a pool. And the figure does not break down below municipality level: there is no split by village or by estate, so it is impossible to say how many are in Miami Platja and how many in the town itself. When we divide the area up we do it by geography and by our own work, never by pinning figures on a neighbourhood.

In practice, that profile of a family pool on its own plot is the one a cover pays back fastest. Closed, it cuts evaporation by 70% to 80%: in an 8×4 metre pool, between 15,000 and 25,000 litres a year you do not have to replace. If there is a heat pump, consumption drops by 50% to 60%. The other reason people call us is safety: closed, the slats form a continuous surface that keeps anyone out of the water and holds 100 kg to the NF P90-308 standard, a French standard, not a European one. That does not make it a walk-on or step-on surface, and nobody should walk on it. You can see the whole province in pool covers in Tarragona, the full picture in pool covers in Catalonia and the rest of Catalonia in Barcelona and Girona.

Wind, salt air and a house shut up for the winter: what the Costa Dorada asks of a cover

Start with the wind, because on this stretch of coast it is the first thing that comes up in any conversation about a pool. It even shows in the street names: the streets of Miami Platja are named after winds — Mestral, Gregal, Garbí — and the municipal Club de Mar is reached from the Platja Cristall seafront promenade and from carrer del Gregal. What matters for your pool is how exposed your plot is: the municipality is built on two very different levels, the coastal strip wide open to the sea and the sheltered inland part at the foot of the Serra de Llaberia. Our Barcelona team looks at that on the day they call at your house to take the measurements. And the wind counts for two reasons. Evaporation: air moving across the water is, after the sun, the great driver of water and heat loss, and a closed cover takes that surface out of the wind. And what the wind carries: with the cover on, leaves and fine sand stay on top and are rinsed off with a hose.

The second thing is salt, and here it is almost everywhere. The municipality has 12 kilometres of coastline: low, coarse golden sand along the Miami Platja front — the Platja Cristall runs for about 1,200 metres, with its promenade — and a rocky front of coves north of the town: the Cala dels Àngels, the Cala del Pescador, the Cala Bot, the Cala Califòrnia, the Cala dels Penyals and the cala de Rifà, stitched together since 2025 by the Passeig de les Cales. To the south the municipality ends at the Platja de la Punta del Riu, at the mouth of the riu de Llastres, on the boundary with Vandellòs i l’Hospitalet de l’Infant. That salt-laden breeze is why the structure, the shaft, the brackets and the fittings are AISI 316L stainless steel, and why we never use aluminium. Maintenance is next to nothing: rinse the slats, the shaft and the brackets with fresh water. There are no rails or guides to grease, because the slats float on the water.

The third thing is what falls into the pool for the rest of the year, and here the hills come right up to the house. In the north-western sector of the municipality there are two PEIN sites, the Pla d’Espais d’Interès Natural: the Serra de Llaberia and Mare de Déu de la Roca itself. The Serra de Llaberia is also an Espai Natural Protegit and forms part of the Natura 2000 network both as a Special Area of Conservation and as a Special Protection Area: 10,350.40 hectares in all, of which 214.05 — 2.07% — fall inside Mont-roig del Camp. Between the hills and the coast lies the farmed landscape of Siurana PDO olives, almonds and carob trees, the same one Joan Miró painted during the summers he spent at the family farmhouse in the municipality. Having that above you is part of what the plot is worth, and the reason the bottom of the pool gets dirty: leaves, pollen and fine soil end up in the water every time the wind blows off the land.

The fourth thing is the household calendar, and here it weighs heaviest of all. With 66.8% of family dwellings outside main-residence use, a great many pools spend half the season with nobody in front of them: the house is shut up in September and opened again in June. A closed cover keeps the water covered, the bottom clean and access blocked for all of those months. With one safety warning we always repeat: the cover has no alarm and no obstacle sensors, it detects nothing and it does not stop on its own. Operate it with the pool in full view and nothing on top of it, and never pull the slats by hand.

And the fifth is winter, which here does not mean a pool shut away but a pool at rest: the water is left covered and the system ticking over, evaporation falls by 70% to 80%, the pool does not fill with leaves and chemical use drops by around 35%. What we do not do is winter tarpaulins or thermal blankets; nor walk-on covers, telescopic covers, domes or enclosures. Only automatic slatted covers, and since 2005.

With all of that, the choice of slat is not a matter of taste. The PVC slat suits the sheltered pools of the town and the inland part, and is made in four shades: white, beige, grey and blue. Solar polycarbonate uses the sun to stretch the season and adds 6 or 7 °C during the day at no running cost, in seven shades: blue, royal blue, platinum, green, smoke, royal black and royal grey. Transparent polycarbonate comes into its own on pools with a view, in three finishes: transparent, platinum and blue. We set it all out, with sections and weights, in slat types, and the roller systems in cover models.

Installations on the coast

See more photos in the gallery →

How many months can you swim in Mont-roig del Camp?

A cover closed overnight stretches the swimming season at both ends, in spring and in autumn, which is exactly where it is lost: at night an uncovered pool gives back what it gained during the day, and that shows in May and October far more than in August.

The cover does two things at once. It holds back evaporation, which is where most of the heat goes, by 70% to 80%; and if you choose solar polycarbonate slats, it lets the sun through and warms the water underneath at no running cost, 6 or 7 °C during the day. And if there is also a heat pump, with the cover in place it uses 50% to 60% less, because it is not spending the whole night replacing what has evaporated.

What owners say once the cover is in

4.7 15 Google reviews See them on Google →
SR

Santiago R.

“As my wife rightly says — how lucky we were to find this company. They have done a flawless job because they genuinely know their trade. They know covers, which is what they make and sell, and on top of that they are good people. Thoroughly recommended.”

Google review · translated from Spanish
JC

Julia C.

“The cover is made from excellent materials and the finish is flawless. From the very first contact the service was outstanding and highly professional. They delivered everything they promised and the result exceeded my expectations. I would recommend them without hesitation.”

Google review · translated from Spanish
T

Teresa

“From the first phone call with the office through to the fitters on the last day, everything was spot on: professional, punctual and tidy. It is a pleasure to find companies that still work like this.”

Google review · translated from Spanish
GR

Giuliana R.

“Excellent pool cover. Everything was good, from the advice to the installation. The cover is very well made, works beautifully and keeps the pool clean and protected. We are delighted with it and would certainly recommend them.”

Google Local Guide · translated from Spanish
EV

Eva V.

“Thoroughly recommended. We are delighted with the cover they fitted for us. The service has been excellent from the very first moment, advising us at every step of the process.”

Google review · translated from Spanish

What owners in Mont-roig del Camp ask us

Our pool in Miami Platja was built decades ago. Can it be covered without building work?

Yes, and it is the job we are asked for most here. On an existing pool we fit the roller unit above the water: the shaft is carried on its AISI 316L stainless steel legs, which are what rests on the coping stone, left visible or inside a housing. The pool shell is not cut into, the filtration plant is not changed, and we use the power point the pool already has. A good many of the shells here were built along with the estate, decades ago, and almost none of them comes to a catalogue size: our Barcelona team comes to your house to measure and we build the cover to those dimensions. It is 4 to 5 weeks of manufacture plus the fitting, which is one or two days.

Will it stand up to the salt air at Platja Cristall and the coves?

That is exactly what AISI 316L is for: a stainless steel alloyed with molybdenum for marine environments. It is the material of our whole structure, of the shaft, of the brackets and of every fitting, with no exceptions, and we never use aluminium. The slats are not affected by salt either. All we ask is that you rinse them with fresh water now and then, above all after several days of onshore wind. There are no rails, no guides and no side profiles to grease, because the slats float on the water.

We only come to Miami Platja in summer and the house is shut the rest of the year. How is that organised?

It is the normal situation in the municipality: 66.8% of family homes are not a main residence, according to the 2021 Census. Our Barcelona team measures with the house shut if someone you trust, or whoever looks after the maintenance for you, lets them in; we build in Torrijos meanwhile and the fitting is left for days when you are here. The cover is operated beside the pool with a key switch and on hold-to-run, so whoever keeps an eye on the house can open and close it, on one condition: you have to watch the pool, because it has no alarm and no obstacle sensors, and it does not stop on its own. And closed while you are away, the bottom stays clean and chemical consumption falls by around 35%.

We are building at Bonmont Terres Noves and we do not want to see anything on the coping stone. Is there an option?

Yes: the submerged roller. The shaft is hidden in a recess inside the pool shell itself and from the terrace you see nothing but water, which is what you are after when the whole argument of the house is the view of the sea or of the golf course. The condition is the calendar: it has to be allowed for in the project, with dimensions and the recess opening, before any concrete is poured. If the pool is already built, the answer becomes a visible shaft above the water, left exposed or inside a housing; we supply that housing ourselves and it is not a bench to sit on. Call us while the pool is still a drawing and we will talk to your builder.

Who comes to the house to measure and who fits the cover? And is there a hand-crank cover, without a motor?

We are the manufacturer: the cover is built to size at our own factory in Torrijos (Toledo), we set the price ourselves and the three-year warranty is Ingerclima’s. And the people who come to your house to measure, who fit the cover and who are still there for the after-sales are our Barcelona team, who cover the whole of Catalonia: Barcelona, Girona, Tarragona and Lleida. You come in through Ingerclima —this website and this telephone number are ours— and from here we put you through to them, so the visit and the fitting are done by people from the area, not by someone passing through. And no, there is no hand-crank version: every cover is motorised. What you choose is two things, the roller unit (above the water, with or without a housing, or submerged) and the slat (PVC, solar polycarbonate or transparent). Nor do we make winter tarpaulins, thermal blankets, walk-on covers, telescopic covers, domes or enclosures. The warranty is three years: structure, motor, slats and fitting.

Architects, builders and developers in Mont-roig del Camp

If you are an architect, a builder or a developer putting up housing here, what matters is deciding on the cover at design stage: the submerged shaft has to be allowed for in the shell before any concrete is poured, and if the decision arrives at the end of the works the usual answer is a visible shaft on the coping stone. On the hillside plots on the way up into the hills, with retaining walls, it pays to check the clear width of the coping early, along with the access for bringing the shaft in, as it travels in a single piece; and in the municipality’s development sectors, such as Les Pobles Migdia, between the Pixerota and Rifà ravines, the planning sits alongside two PEIN protected areas. We build in Torrijos (Toledo), with structure, shaft, brackets and fittings in AISI 316L stainless steel, and on site it is fitted by our Barcelona team, who cover the whole of Catalonia. We give you dimensions, the recess opening, where to allow for the power point and the detail of the supports for your drawing, and manufacture is planned at 4 to 5 weeks plus the fitting. If the client is yours, the relationship stays with you.

How we work with professionals Download the slat comparison (PDF) →

Mont-roig del Camp: a longer season without the running costs going up

On this coast the water in an uncovered pool cools overnight and, in spring and autumn, during the day as well whenever the onshore wind gets up. Which is why anyone who wants to stretch the season ends up looking at a heat pump.

Before choosing equipment it is worth knowing this: evaporation is a pool’s biggest single route for heat loss, and an automatic slatted cover cuts it by between 70% and 80%. The energy used by the heating system drops with it by between 50% and 60%. Without a cover, the heat pump works all night replacing what evaporates, and it is the uncovered pool that runs up the bill, not the equipment.

The combination that works best here is a solar polycarbonate cover with the equipment sized afterwards, once the losses are under control. We are an official Calorex distributor and we heat the pool with a heat pump, a chiller and a dehumidifier: it is all set out in pool heating.

Shall we talk about your pool in Mont-roig del Camp?

Tell us where the pool is — in Miami Platja, in the town itself, in Les Pobles, at Bonmont Terres Noves or on any estate in the municipality — and we will put together a no-obligation quote in under 24 hours. Built at our own factory in Torrijos, fitted and looked after by our Barcelona team, and a technical service with original spare parts.

Chat with us on WhatsApp